抹面砂漿的技術(shù)要求有哪些,能讓建筑愈加堅固結(jié)實嗎?
來源:http://www.wodeapartment.com 日期:2019-10-30 發(fā)布人:
如今的城市中各種樓房大夏密密麻麻,有種“欲與天公試比高”的覺得。事實上這些大廈的建成都離不開外墻保溫砂漿的運用,外墻保溫砂漿不只能維護內(nèi)層材料,讓修建愈加堅固結(jié)實,并且還可以讓修建表面平整潤滑的同時具有著防水的能。
Nowadays, there are many buildings in the city in summer. There is a feeling of "trying to compete with the heavenly Father". In fact, the construction of these buildings can not be separated from the use of external wall thermal insulation mortar. The external wall thermal insulation mortar can not only maintain the inner layer materials, making the construction more solid and solid, but also make the construction surface smooth and smooth with waterproof function.
下面濟南抹面砂漿公司帶我們理解下外墻保溫砂漿的施工操作流程:
Jinan plastering mortar Co., Ltd. takes us to understand the construction process of exterior wall thermal insulation mortar:
1.外墻保溫砂漿運用前要先與水攪拌1:2份額,攪拌后當即運用。

1. The external wall thermal insulation mortar shall be mixed with water for 1:2 before application, and shall be applied immediately after mixing.
2.為了保證施工前表面潔凈平整、無油漬,一些沉浮、斷裂、松動、風化的局部也要提早根除。
2. In order to ensure that the surface is clean, flat and free of oil stains before construction, some floating, broken, loose and weathered parts should also be eradicated in advance.
3.對混凝土墻體和砌塊墻體施工時應(yīng)涂滿砂漿膠粉。在涂改層時厚度不能大于10mm,今后每層厚度不能大于20mm,兩次施工時辰應(yīng)該距離24小時以上。
3. The concrete wall and block wall shall be coated with mortar powder during construction. When the first layer is altered, the thickness shall not be greater than 10 mm. In the future, the thickness of each layer shall not be greater than 20 mm. The two construction hours shall be more than 24 hours away.
4.在抗裂層中用金屬網(wǎng)替代網(wǎng)格布作為加強骨架,使其銜接結(jié)實。等保溫層單調(diào)今后才干夠停止抗裂保溫施工。
4. In the anti crack layer, the metal mesh is used instead of the mesh cloth as the reinforcing framework to make it connected firmly. Only when the insulation layer is monotonous can the anti crack insulation construction be stopped in the future.
5.在保溫層、維護層單調(diào)前首要做到避免水沖、碰擊、和震動。兩者的施工應(yīng)該依照國度規(guī)范規(guī)劃,施工厚度不允許有負誤差。
5. Before the insulation layer and maintenance layer are monotonous, avoid water flushing, bumping and vibration. The construction of the two should be in accordance with the national standard planning, the construction thickness is not allowed to have negative error.
別的還要留意的是,外墻保溫砂漿消費時要操控砂的含水率,由于假如砂的含水率過高,砂特別簡單粘結(jié)成團,砂粒也更易賭賽篩網(wǎng),更終會招致篩分效率降低。所以,這一切只要準備好了才干順利完成砂漿施工。
In addition, it should be noted that the water content of the sand should be controlled when the external wall thermal insulation mortar is consumed, because if the water content of the sand is too high, the sand is particularly simple to bond into a group, and the sand particles are more likely to bet on the screen, which will eventually lead to the reduction of screening efficiency. Therefore, as long as all these are ready, the mortar construction can be completed smoothly.