家庭裝修時(shí),一般都會(huì)選擇膩?zhàn)臃郏敲慈绾握莆漳佔(zhàn)臃凼┕さ墓に嚹?這樣以后就不用返工了,下面小編為您做一下膩?zhàn)臃壑谱鞯闹攸c(diǎn)介紹:
Family decoration, the general choice of putty powder, then how to master the putty powder construction process? In this way, there is no need to rework later, the following Xiaobian for you to do the focus of putty powder production:
施工準(zhǔn)備:
Construction preparation:
1. 防水膩?zhàn)痈嗖牧蠙z查:每批防水膩?zhàn)舆M(jìn)入現(xiàn)場(chǎng)后,隨機(jī)選擇3袋進(jìn)行施工檢查,檢查設(shè)置時(shí)間、細(xì)度、白度及與基層的粘結(jié)強(qiáng)度。不合格的不得使用。
1. Inspection of waterproof putty paste materials: After each batch of waterproof putty enters the site, three bags are randomly selected for construction inspection, and the setting time, fineness, whiteness and bonding strength with the base are checked. Unqualified must not be used.
2、工具準(zhǔn)備:濕噴鍋或輥刷、0.2mm厚的不銹鋼刮刀、2把直尺、水平尺、膩?zhàn)拥?-2英寸、料斗、料斗、粉袋、掃帚、刀、刷、刷、線滴、直尺。
2. Tool preparation: wet spraying pot or roller brush, 0.2mm thick stainless steel scraper, 2 rulers, horizontal ruler, putty knife 1-2 inches, hopper, hopper, powder bag, broom, knife, brush, line drop, ruler.
工藝流程:
Technological process:
根據(jù)產(chǎn)品手冊(cè)進(jìn)行治療→混合防水和油膩的水→刮防水和油膩的首次→厚度不應(yīng)小于0.8毫米→掛網(wǎng)布和平整墻壁→修復(fù)和水準(zhǔn)陰陽(yáng)角和一些水平角→刮防水和油膩的水角的第二次,厚度約0.5毫米→正確的陰陽(yáng)角→修復(fù)棱角→波蘭和出版社。
According to the product manual for treatment mixed waterproof and greasy water scraping waterproof and greasy first thickness should not be less than 0.8mm hanging mesh cloth and flat wall repair and level Yin and Yang angle and some horizontal angle scraping waterproof and greasy water angle second, thickness is about 0.5mm correct Yin and Yang angle repair edge angle Poland And publishing houses.
1、尋找彈簧線的規(guī)律,粘貼防污染膠帶。
1. Search for the law of spring line and stick anti-pollution tape.
2. 在門(mén)窗邊緣和裝飾線周?chē)迟N防污染條。
2. Stick anti-pollution strips around the edges of doors and windows and decorative lines.
3.混合防水膩?zhàn)印?/div>
3. Mixed waterproof putty.
根據(jù)廠家提供的使用比例攪拌后即可施工。調(diào)質(zhì)膩?zhàn)硬灰颂?,用多少調(diào),用多少調(diào),應(yīng)在兩小時(shí)內(nèi)用完。
According to the proportion provided by the manufacturer, it can be constructed after mixing. Conditioning putty should not be too much, how many adjustments, how many adjustments, should be used up in two hours.
![濟(jì)南膩?zhàn)臃? src=]()
4、基層處理
4. Grass-roots treatment
不同類型、不同廠家的膩?zhàn)邮褂貌灰粯樱诨咎幚頃r(shí)應(yīng)嚴(yán)格按照廠家的說(shuō)明進(jìn)行處理。
Putties of different types and manufacturers are used differently, and they should be treated strictly according to the manufacturer's instructions in the basic treatment.
5、一般一層膩?zhàn)佑脙纱尾拍艽婊?/div>
5. A layer of putty can survive only twice.
膩?zhàn)雍穸?.5 ~ 1.5mm。次刮膩?zhàn)訒r(shí)要找平時(shí),膩?zhàn)雍穸?.5 ~ 0.8mm至均勻成型。膩?zhàn)雍穸燃s0.3 ~ 0.5mm。工藝以水平和垂直、力向均勻、覆蓋油脂達(dá)到勻光、不突然變輕和變重,以避免不同顏色、糊現(xiàn)象。表面膩?zhàn)討?yīng)在膩?zhàn)庸袒巴瓿?。第二層表面膩?zhàn)硬涣艉圹E,大面積表面光滑,光線方向自然,適合采光。膩?zhàn)哟闻c第二次之間的間隔時(shí)間和壓光時(shí)間應(yīng)根據(jù)具體產(chǎn)品確定,并應(yīng)服從制造商的指示。
Putty thickness is 0.5-1.5 mm. When scraping putty for the first time, the thickness of putty should be from 0.5 mm to 0.8 mm until it is evenly shaped. Putty thickness is about 0.3-0.5 mm. In order to avoid different color and paste phenomena, the technology uses horizontal and vertical, uniform force direction, uniform coverage of grease, no sudden lightening and weight change. Surface putty should be finished before putty curing. The second layer of putty does not leave traces, large area of smooth surface, natural light direction, suitable for lighting. The interval and calendering time between the first and the second time of putty shall be determined according to the specific product and shall be subject to the instructions of the manufacturer.
6、膩?zhàn)右螌?shí)輕壓實(shí)
6. Putty should be scraped and compacted
刮擦均勻,效果光滑,對(duì)于劃痕和不平,宜采用40 ~ 60目砂紙研磨。作為后的裝飾層的膩?zhàn)?,如油漆在這個(gè)表面,應(yīng)用水砂紙到啞光表面。
Scraping is even and the effect is smooth. For scratches and unevenness, 40 - 60 mesh sandpaper is suitable for grinding. Putty as the final decorative layer, such as paint on this surface, apply sandpaper to matte surface.
7. 打磨和拋光
7. Grinding and Polishing
第二次刮膩?zhàn)雍髴?yīng)及時(shí)除去裝飾線的橡膠條,清洗并修補(bǔ)邊角,用膩?zhàn)拥锻诙?,陰?yáng)角,裝飾線多余的膩?zhàn)隅P鏟,清洗干凈,達(dá)到線條清晰,無(wú)污染。凹面修補(bǔ)應(yīng)先將水輥打濕,刮削修補(bǔ)處略高于原墻面,待完全干燥后,用細(xì)砂紙磨平抹平。
After scraping putty for the second time, the rubber strips of decorative lines should be removed in time, the edges and corners should be cleaned and repaired, the holes should be digged with putty knife, the Yin and Yang angles should be used, and the excess putty shovels and shovels of decorative lines should be cleaned, so that the lines are clear and pollution-free. Concave repair should first wet the water roller, scraping repair slightly higher than the original wall, to be completely dry, with fine sandpaper grinding flat.