抹面砂漿在施工后需要馬上保養(yǎng),保養(yǎng)需要留意施工時(shí)的溫度,在依據(jù)溫度的狀況確認(rèn)保養(yǎng)時(shí)需要準(zhǔn)備的材料,此外也是有無需保養(yǎng)的產(chǎn)品,具體保養(yǎng)條件如下所示:
The plastering mortar needs to be maintained immediately after construction, and attention should be paid to the temperature during construction. The materials that need to be prepared for maintenance should be confirmed based on the temperature condition. In addition, there are products that do not require maintenance, and the specific maintenance conditions are as follows:
冬天施工日平均氣溫小于5°C時(shí)要按冬天施工并滿足以下規(guī)定:
When the average daily temperature during winter construction is less than 5 ° C, it should be carried out in winter and meet the following requirements:
1.施工前要采取一定的有效措施加熱基礎(chǔ)表層,使其溫度維持在KTC以上,并清理存水。
1. Before construction, effective measures should be taken to heat the surface layer of the foundation, maintain its temperature above KTC, and clean up any stored water.
2.受冷前,水泥基工程材料的抗壓程度不可小于6MPa。
Before being cooled, the compressive strength of cement-based engineering materials should not be less than 6MPa.
高溫氣候環(huán)境施工施工位置溫度超過37°C,應(yīng)按高溫氣候延緩施工并滿足以下規(guī)定:
If the temperature of the construction site in a high-temperature climate exceeds 37 ° C, the construction should be postponed according to the high-temperature climate and meet the following requirements:
1.施工前24小時(shí)采取一定的有效措施,避免施工位置受到遭受直射或別的輻射熱。
1. Take effective measures 24 hours before construction to avoid direct sunlight or other radiation heat at the construction site.
2.采取適度減溫措施,與水泥基工程材料接觸的混凝土基礎(chǔ)和設(shè)備底板的溫度不可超過37°C。
2. Take appropriate temperature reduction measures, and the temperature of the concrete foundation and equipment bottom plate in contact with cement-based engineering materials shall not exceed 37 ° C.

3. The molding temperature of Jinan plastering mortar slurry should not exceed 35 ° C.
4.施工后應(yīng)及時(shí)采取補(bǔ)濕保養(yǎng)措施。
4. Moisturizing and maintenance measures should be taken promptly after construction.
施工溫度超過5°小于37°時(shí),基礎(chǔ)施工后無需保養(yǎng)。超過溫度范圍應(yīng)遵循抹面砂漿施工保養(yǎng)方法實(shí)行保養(yǎng)。
When the construction temperature exceeds 5 ° C but is less than 37 ° C, there is no need for maintenance after the foundation construction. If the temperature exceeds the range, the maintenance method for plastering mortar construction should be followed for maintenance.
冬天保養(yǎng)需要準(zhǔn)備的材料:棉被、薄膜這些材料主要是為了保溫,因?yàn)槎鞙囟冗^低,因此需要做好保溫防范準(zhǔn)備
Materials that need to be prepared for winter maintenance: cotton quilts, thin films, etc. These materials are mainly used for insulation. Due to the low temperature in winter, it is necessary to prepare for insulation prevention
夏天保養(yǎng)需要準(zhǔn)備的材料:薄膜,薄膜主要是為了補(bǔ)濕,預(yù)防水分的太早外流造成產(chǎn)品施工內(nèi)部無法牢固。
Materials that need to be prepared for summer maintenance: thin film, which is mainly used to supplement moisture and prevent the early outflow of moisture from causing the internal construction of the product to become unstable.
In addition, it is important to sprinkle water on time, as it is also used to supplement moisture, as internal reactions require a large amount of water after construction. For more related matters, come to our website http://www.wodeapartment.com Contact for consultation!